Postal Study IT 2.0 Solutions – Work Flow for Operation Module postalstudy May 26, 2025 IT 2.0 Solutions – Work Flow for Operation Module Download PDF Post navigation Previous Previous post: Discontinue of CSC in POs w.e.f 28/05/2025Next Next post: Post Office Work Flow Charts – Bank Drawing, Bank Remittance, SO Cash Request, Bo Cash Request Leave a Reply Cancel replyYou must be logged in to post a comment. Related News Postal Study Direct Link for “Salary Slip” Generation in APT 2.0 January 31, 2026 0 Postal Study Cadre Restructuring of PA/SA, LSG, HSG-II and HSG-I Posts of Post Offices (POs), Railway Mail Service (RMS) and Circle/Regional Offices (CO/RO)- reg January 30, 2026 0